How a custom kitchen comes together
We measure every wall, note ceiling heights, and mark utility locations.
The full-service package
Every project covers precise measurement, custom cabinet fabrication at our Doral shop, complete removal and disposal of your existing cabinetry, professional installation, and a one-year craftsmanship warranty. Material options range from imported European laminate to solid wood veneer, with a curated selection of soft-close hinges, drawer boxes, and interior accessories. Fabrication typically takes three to five weeks after design approval; installation of a standard kitchen runs two to four days.
Our process
1. Free in-home consultation
We visit your home to measure the space and discuss your design preferences — or start at our Doral showroom if you'd rather see samples first.
2. 3D design & material selection
Our designer produces a full-color 3D rendering of your new kitchen alongside physical material samples.
3. Custom fabrication
Your cabinets are built to exact specification at our Doral fabrication shop, quality-checked before they leave the floor.
4. Installation & cleanup
Full removal of old cabinetry, precision installation, door and drawer adjustments, and complete job-site cleanup.
Timeline questions
How long does a kitchen cabinet installation take?
Fabrication typically takes three to five weeks after the design is approved. Installation of a standard kitchen runs two to four days; larger projects with tall pantry walls, islands, and specialty accessories may take an extra day or two.
Do you have a showroom I can visit?
Yes — our main showroom and fabrication facility are in Doral on NW 87th Avenue. Walk through kitchen displays, compare door styles and finishes, and speak directly with a designer. No appointment required.
